Service positions
A construction fence tender typically consists of the following services:
| Serwis | Opis | Typical unit |
|---|---|---|
| Deliver | Transport to construction site | lfm lub psch |
| Set up | Assembly of fence system | lfm |
| Retain | Provision over rental period | lfm/Wo, lfm/Mt lub VE |
| Relocate | Moving during construction progress | lfm |
| Usuń | Dismantling and transport away | lfm |
What do these abbreviations mean? See units legend
Position structures in practice
Each service is tendered and priced individually.
Pos. 1.1 Set up 200 lfm
Pos. 1.2 Retain 4.000 lfm/Tydzień
Pos. 1.3 Usuń 200 lfm
Payment after each service completion
All services in one position.
Pos. 1.1 Deliver, set up, retain, remove
200 lfm
Payment: 70% after setup, 30% after removal
Base period included, extension separate.
Pos. 001 Base (4 weeks)
85 lfm
Pos. 002 Extension
2.380 lfm/Tydzień
Payment: Base after setup, extension monthly
Units explained
| Abbreviation | Meaning | Calculation |
|---|---|---|
| lfm | Linear meter | Fence length |
| lfm/Wo | Linear meter-weeks | Długość × Tygodnie |
| lfm/Mt | Linear meter-months | Długość × Months |
| VE | Billing unit | = lfm × Time unit |
| St | Sztuka | For gates, locks, etc. |
| St/Wo | Piece-weeks | Ilość × Tygodnie |
| psch | Lump sum | Fixed price |
Linear meters explained
Why linear meters? The term comes from measuring by running along the length - only the length counts, not width or height.
Linear meter (lfm) = the actual fence length, regardless of fence height.
The length is multiplied by the duration:
Example calculation: 100 lfm fence × 8 Tygodnie = 800 lfm/Tydzień
This unit price per lfm/week is then multiplied by 800 to get the total retention cost.
Technical terms
- Mobile fence / Construction fence Modular system
- Steel frame elements Galvanized frame
- Round steel bars Vertical bars
- Concrete foot / Support foot ca. 25-35 kg
- Connecting clamp Clamp connection
- Security clamp Theft-proof
- Pedestrian gate ca. 1 m
- Vehicle gate / Construction gate ca. 3-6 m
- Swing gate Opens inward/outward
- Sliding gate Space-saving
- Gate lock Chain + combination lock
- Bariera – Red/white barrier (1-2 m)
- Guide beacon – Warning beacon with reflective film
- RA1 / RA2 / RA3 – Reflection class (RA3 = strongest)
- RSA – Guidelines for securing work sites
- Base plate – Weighted stand base
Legal basis: VOB and construction site regulations
Construction fence tenders in Germany are governed by several legal frameworks. Understanding these is essential for correctly structuring a tender.
The Vergabe- und Vertragsordnung für Bauleistungen (VOB) Part C defines general technical contract conditions for construction services.
Section 4.1 (Nebenleistungen): Construction site setup can be treated as an ancillary service (Nebenleistung) — meaning it does not need to appear explicitly in the tender and is included in the contractor's overhead without separate remuneration.
Alternative: If explicitly listed in the schedule of quantities (Leistungsverzeichnis), it becomes a "Besondere Leistung" and must be priced as a separate item.
The type of procurement procedure depends on the estimated contract value:
- Direct award (freihändige Vergabe): up to approx. 3,000 EUR (net) — no formal tender required
- Restricted tender (beschränkte Ausschreibung): up to approx. 50,000 EUR (net) — selected bidders only
- Public tender (öffentliche Ausschreibung): above approx. 50,000 EUR — open to all qualified bidders
- EU threshold (VgV/GWB): above 5,538,000 EUR — EU-wide procurement required
Thresholds are set by UVgO for sub-threshold and GWB/VgV for above-threshold procurements.
Nebenleistung vs. Besondere Leistung: What does it mean for bidders?
| Criterion | Nebenleistung (ancillary) | Besondere Leistung (special) |
|---|---|---|
| Listed in LV? | Nie | Tak |
| Separate remuneration? | No — included in overhead | Yes — own unit price |
| Bidder must price separately? | Nie | Tak |
| Typical for construction fences? | Small projects, short duration | Medium to large projects |
LABO reference values for construction fence positions
The LABO (Länderausschuss für Bautechnik) publishes reference price data for construction site setup positions. These values are widely used by public clients in Germany as benchmarks for plausibility checks.
| OZ (Position No.) | Service description | Jednostka | LABO avg. |
|---|---|---|---|
210.310.021 |
Construction fence: deliver, set up, remove (one-time) | m | approx. 6,21 EUR |
210.310.022 |
Construction fence: retain and maintain | m | approx. 3,02 EUR |
210.310.023 |
Construction fence: retain and maintain | m/tydzień | approx. 15,36 EUR |
210.310.024 |
Construction fence: remove only | m | approx. 1,57 EUR |
210.310.025 |
Construction fence: relocate | m | approx. 2,75 EUR |
210.310.052 |
Construction gate, timber, double-leaf | piece | approx. 335 EUR |
Source: LABO – Leistungsbeschreibung Baustelleneinrichtung (LB-AF 210)
The official position description: "Stahlrohrgitterelement"
In LABO and official tender documents, mobile construction fences are often described as "Stahlrohrgitterelement" or "Bauzaun aus Einzelelementen". These are the terms to look out for when searching tender portals.
Stahlrohrgitterelement
Bauzaun aus Einzelelementen
LB-AF 210 / LB 210
Construction site setup: share of total project costs
The total cost of construction site setup (Baustelleneinrichtung, BE) — of which the construction fence is a key component — typically amounts to the following share of total construction cost:
| Project type | Incl. equipment holding costs | Excl. equipment holding costs |
|---|---|---|
| General building construction (Hochbau) | 5–8 % | 3–6 % |
| Civil / structural engineering (Ingenieurbau) | 6–11 % | 3–6 % |
| Fit-out and finishing trades (Ausbaugewerke) | — | 1–2 % |
Source: Bauprofessor (f:data GmbH), Kalkulation Baustelleneinrichtung, 2023
How the BE costs are distributed
When construction site setup is tendered as separate LV positions, costs split roughly as follows:
The holding costs (Vorhalten) are often treated as ancillary costs (Nebenleistung) and distributed across the BGK (Baustellengemeinkosten).
Calculation variants according to VOB
Types of public procurement in Germany
For public clients (municipalities, federal agencies, state governments), the procurement procedure is legally mandated. As a bidder, you need to know which procedure applies to your tender.
Freihändige Vergabe
Direct award
up to ~3,000 EURClient selects provider directly, no formal procedure required.
Beschränkte Ausschreibung
Restricted tender
up to ~50,000 EURSelected bidders are invited. No public announcement required.
Öffentliche Ausschreibung
Public tender
above ~50,000 EURAnnounced publicly. Any qualified bidder may submit an offer.
EU-weite Ausschreibung
EU-wide tender (VgV/GWB)
above 5,538,000 EURMust be published in the Official Journal of the EU (TED). Open to European bidders.
Where to find public tenders for construction fences in Germany
Tip: Search for "Bauzaun", "Stahlrohrgitterelement" or "LB 210" to find relevant tenders.
Sample tender
Construction time: ca. 32 tygodni
Base period: 4 tygodni
| Pos. | Serwis | Ilość | Jednostka |
|---|---|---|---|
| 001 | Construction fence deliver, set up, retain 4 weeks, remove | 85 | lfm |
| 002 | Extension retention construction fence | 2.380 | lfm/Wo |
| 003 | Construction fence gate 4m, 2-wing (base period 4 weeks) | 1 | St |
| 004 | Extension gate | 28 | St/Wo |
| 005 | Gate lock (base retention period 4 weeks) | 1 | Stk |
| 006 | Extension gate lock | 28 | St/Wo |
| 007 | Travel cost lump sum | 2 | Stk |
| 008 | Relocate fence elements | 15 | m |
Calculation extension
Project duration: 32 tygodni Base period: 4 tygodni Extension: 28 tygodni 85 lfm × 28 tygodni = 2.380 lfm/Wo
Checklist for your tender
- Total length in linear meters
- Fence height (standard: 2.00 m)
- Rental duration (start / end)
- Number and width of gates
- Stability (concrete feet or ground anchors)
- Relocation required? How often?
- Additional equipment (privacy screen, lighting)
- Delivery address and access options
Digital data exchange (GAEB)
Tenders are often provided in GAEB format:
| Format | Purpose |
|---|---|
| D83 / X83 | Tender (Client → Bidder) |
| D84 / X84 | Offer (Bidder → Client) |
Current standard: GAEB DA XML 3.3 (since 2019)
Free conversion tools
Official documentation: gaeb.de
Sample tender text
Use these text blocks as a basis for your tender. Adapt the values in [brackets] to your project.
tender_text_intro
tender_text_fence
tender_text_gates
tender_text_accessories
tender_text_traffic
tender_text_logistics
Tender generator
Project information
Ogrodzenie budowlane
Akcesoria
| Position | Ilość | Type |
|---|---|---|
|
|
pcs
|
|
|
|
pcs
|
|
|
|
pcs
|
— |
|
|
pcs
|
|
|
|
pcs
|
— |
|
|
x
|
— |
Logistics
Logistics services will be included as separate positions in the tender.